Friday, May 4, 2018
Breaking News
Home » Campground and RV Park News » AR: Construction delays of a new waste water treatment facility

AR: Construction delays of a new waste water treatment facility

(March 9, 2018) -- Buffalo National River is currently upgrading utilities that service the Buffalo Point Campground. The flush restrooms, shower facilities, and dump station at Buffalo Point will remain closed until the infrastructure upgrades are completed later this spring.

JASPER, Ark. — Buffalo National River is currently upgrading utilities that service the Buffalo Point Campground. The flush restrooms, shower facilities, and dump station at Buffalo Point will remain closed until the infrastructure upgrades are completed later this spring.

Portable toilets will be available for visitors to use in areas adjacent to the current restroom facilities. Electrical and water hookups will be turned on and available at all drive-in sites starting March 15.

Due to construction, E Loop will be closed to all campers. A, B, C, and D Loops, the walk-in tent sites, and Pavilions 2 and 3 will be open and available on March 15.

Read the full story from Newton County Times.

Print Friendly, PDF & Email

About Rebecca Smith

Rebecca Smith is a Wisconsin native currently living in Illinois with her husband, Eric, and two dogs, Maggie and Grace. She enjoys hiking, biking, kayaking and, of course, camping in cabins and park models.

One comment

  1. Thank you for bringing attention to this issue! I used to work at the library unfortunately, this staff needle injury is not even the first incident of its kind. The opioid crisis has a profound effect on our libraries, and system refuses to talk about it. They fear that installing sharps containers will cause people to associate libraries with drug use, so they stick their heads in the sand. This also relates to the bathroom access issue last year restroom drug use is so routine that SPL simply limits access to single-occupant restrooms rather than finding a way to supports transgender patrons who feel unsafe in those multistall gendered restrooms with the super short stall doors. Now they are finally building single occupant gender neutral restrooms. Thank you for flipping the script so that SPL can see the PR dangers of their tone-deaf failure to provide sharps containers. I hope the coverage has an effect. custom writings

Leave a Reply

Your email address will not be published. Required fields are marked *

*

RV Daily Report welcomes comments from readers. However, we expect that comments will be cordial and professional without reverting to name-calling, profanity and libelous language. Comments of that nature will be removed.